The top of the wall is covered by a copper coping cover similar to detail 9 3a.
Parapet roof flashing details.
High wall flashing detail 5 wide sheets.
High wall flashing detail 10 wide sheets.
This detail shows a flashing condition at a vertical wall or parapet.
Parapet wall cap custom wall flashing metal products custom made to order.
Parapet removal involves modification to both the wall and roof.
On the roof side the cover is locked into a standing seam parapet cover.
Nov 30 2014 explore alex radford foster s board parapet detail on pinterest.
A combination of elements are used in this detail.
Mf 13 3 1 1 metal cap flashing joints mf 13 3 1 2 metal cap flashing inside corner mf 13 3 1 3 metal cap flashing parapet to wall transition site formed note.
100 dan road canton ma 02021 phone 1 800 451 2504 sales 1 800 576 2358.
This unique type of cap is designed to cover the top of parapet walls.
Parapet with paraguard coping and parasolo flashing.
Parapet walls are a difficult detail with a long history of failure.
Parapet with coping and parasolo flashing.
Where the roof slope is parallel to the parapet or at right angles to the apex of the roof the reconstruction detail after removing the parapet can be relatively simple by incorporating a cavity behind the cladding and flashing the top of the parapet.
Unlike standard exterior walls parapet walls are exposed to the elements on three sides.
At the edge of these roofs parapet walls are commonly found and are.
Furthermore parapets are often inadvertently connected to interior space via balloon framing gaps in structure or penetrations for wiring and mechanicals introducing warm moist.
All of the good series of parapet details presented follow the baker principles and a little bit of other stuff figure 12a figure 12b figure 13 figure 14 and figure 15.
High parapet copper roof.
Paraguard expansion joint roof to roof with parasolo flashing.
Many buildings have flat roofs in certain areas specifically for air condoning units and etc.
See more ideas about parapet architecture details construction drawings.
Water control layer continuity.
Copper base flashing which extends at least 8 up the wall.
This cover in turn laps over base flashing which is cleated to the roof deck or a nailing strip.
Paraguard expansion joint roof to wall with.
The counterflashing laps the base flashing a minimum of 3.
Membranes continuous under the parapet flashing.